Ze-Yu Lu, Wen-Hua Li, Bai-Chen Xie

Rubrique:
Sources renouvelables
Parution:
2015
Titre Ouvrage:
Study on China’s wind power development path—Based on the target for 2030
Édition:
Renewable and Sustainable Energy Review, volume 51, November
Pages:
pp. 197-208
China’s wind power development optimization path during the period 2013–2030 from the perspective of minimum cost ;  the government could achieve its established 2030 cumulative installed capacity target of 400 GW ; but the grid absorptive ability is the most crucial factor constraining wind power development in the initial stage while learning rate and carbon emission permit price, are critical factors affecting the wind power development in subsequent stages.